The capstone record
Nine sheets, and what they have in common is that each belongs to the project rather than to any one session. A lab page assesses an evening; a capstone has substances in the same cupboard for two months, streams meeting in the same waste corner, and waits that decide the schedule.
Before anything is mixed, built or exposed. CS-1 is the project plan: the picture, the instrument and the chemistry chosen against it, the materials, and the budget with a field that asks whether the subtotal is a total or a floor. CS-2 is the whole-project hazard assessment, one row per substance, with the safety data sheet’s own version and date, and a group at the foot for the four sequence hazards a page-by-page assessment cannot see. CS-3 is the waste plan and the contingency rules, written before the first bath. CS-4 is the schedule, with the eight immovable waits already printed so they go into the plan first. All four come from planning the capstone project.
During the work. CS-5 is the pinhole calculation, which the instrument stage makes mandatory for every capstone whatever the camera: the measured figures first, then the computed ones with the arithmetic shown, then the check against the negative that makes it a calculation rather than a formula.
At the end. CS-6 is the portfolio label, one copy per work, carrying the metadata that lets a reader find the negative, the printing map and the session behind the object. CS-7 is the self-assessment against the rubric, with the evidence column that the band claims stand or fall on. Both come from permanence and the portfolio. CS-8 and CS-9 are the chemistry report: the thirteen sections tracked across five checks each, then the classification key and the submission list.
Printing, versions, and why nothing on a sheet explains anything: see printable worksheets.
Pure Silver · The capstone record
CS-1
The project plan
One project. Written before anything is mixed, built or exposed.
The picture, and what it decidesbefore
The instrument and the chemistry, chosen against the picturebefore
Materials, consumables and the budgetbefore
| What | Quantity over the project | Priced from the planner?y / gap | CostGBP |
|---|---|---|---|
Pure Silver · The capstone record
CS-2
The whole-project hazard assessment
One project. One row per substance, read from its own safety data sheet.
The sheets readbefore
One row per substancebefore
| SDS version and datenot the retailer's page | Signal word and H statements | Quantity actually handledper session / over the project | The control | Incompatible with | Storage |
|---|---|---|---|---|---|
The sequence hazards, which belong to the project and not to any sessionbefore
Pure Silver · The capstone record
CS-3
The waste plan and the contingency rules
One project. Written before the first bath is mixed.
One container per stream, labelled on the day it is createdbefore
| Stream | Container and label wording | Where it is kept | Route out | Openeddate |
|---|---|---|---|---|
| Alkaline developer, spent | ||||
| Acidic stop bath | ||||
| Silver-bearing fixer and first rinses | ||||
| Toner and its first rinse | ||||
| Clearing baths and first washes, if the project coats |
Contingency — a decision rule, written calmly, in advancebefore
| If | The rule, written now | The budget it is given |
|---|---|---|
| The build misses its performance goal | ||
| The developer gives an unusable contrast index | ||
| The emulsion or the coating fails | ||
| The weather or the season removes the subject | ||
| A chemical cannot be obtained |
Pure Silver · The capstone record
CS-4
The schedule, with the waits that cannot be compressed
One project. The fixed waits are printed; fill in the dates around them.
The immovable waitsbefore
| Wait | Where it falls in the schedule | Planneddate | Actualdate |
|---|---|---|---|
| Fibre-print washing, 21 min per batch | |||
| Fibre-print washing after toning, 30 min final wash | |||
| Resin-coated print washing, 30 s or three still trays | |||
| Fibre drying and flattening, two sittings a day apart | |||
| Any print density read, 24 h after dry to the touch | |||
| A toned print judged, dry, beside its untoned control | |||
| Coating and drying, to a condition not a clock | |||
| The subject: season, tide, scaffolding, a person |
The sequencing constraint that is not a waitbefore
The stages, backwards from the finished portfoliobefore
| Stage | Starts | Ends | What it hands the next stage |
|---|---|---|---|
Pure Silver · The capstone record
CS-5
The pinhole calculation
One instrument. Mandatory for every capstone, whatever the camera.
Measured, before anything is computedbefore
Computed, with the arithmetic shownas you go
| Quantity | Working | Result | Unit |
|---|---|---|---|
| Optimum diameter, k sqrt(lambda f) | |||
| Your hole against the optimum | |||
| Effective f-number, f / d | |||
| Geometric blur, distant subject | |||
| Diffraction blur, 2.44 lambda f / d | |||
| Where the two blurs cross | |||
| Sheet diagonal | |||
| Diagonal angle of view | |||
| Corner angle off axis | |||
| Corner falloff, cos^4 |
Checked against the negative, which is what makes it a calculationafter
Pure Silver · The capstone record
CS-6
The portfolio label
One work. Print one copy per print in the portfolio.
The label, as it will be printedafter
The references that let a reader find the object's historyafter
Placement in the sequenceafter
Pure Silver · The capstone record
CS-7
The self-assessment against the rubric
One portfolio. A band claimed with no named evidence scores as the band below it.
Four criteria, four bands, and the evidence namedafter
| Criterion | Band claimed | The evidence, named: an artefact and a page |
|---|---|---|
| Accuracy of the chemistry and the numbers | ||
| Craft of the objects | ||
| Coherence of the body of work | ||
| Honesty of the documentation |
The four failure conditions, checked deliberatelyafter
| Condition | How it was checked | Found?y/n | What was done |
|---|---|---|---|
| An unrecorded number | |||
| A formula altered without saying so | |||
| A permanence claim inferred but presented as measured | |||
| A work that cannot be reprinted from its own map |
The shortfalls, written by youafter
Pure Silver · The capstone record
CS-8
The chemistry report — the outline and the classification key
One report. Thirteen sections; every claim classified and every number traced.
The thirteen sectionsafter
| Section | Drafted | Numbers traced | Claims classified | Equations checked | Gaps admitted in place |
|---|---|---|---|---|---|
| 1 The photographic material | |||||
| 2 Exposure | |||||
| 3 Latent-image formation | |||||
| 4 The developer | |||||
| 5 Its chemistry | |||||
| 6 Its pH | |||||
| 7 Processing conditions | |||||
| 8 Fixing | |||||
| 9 Washing | |||||
| 10 The print | |||||
| 11 The toning | |||||
| 12 The final chemistry | |||||
| 13 The threats |
Pure Silver · The capstone record
CS-9
The chemistry report — the claims, and what is submitted with it
The same report as CS-8, checked once the draft is complete.
The classification key — every claim is one of these fiveafter
| Kind of claim | Count in the report | Where the doubtful ones are |
|---|---|---|
| Established chemistry | ||
| Historical evidence | ||
| Photographic convention | ||
| Your own measurement | ||
| Hypothesis |
What is submitted with itafter
Where the fields come from
Every field on these sheets is one a written page of the course asks you to record. Those pages are linked here, and the build fails if one of them stops existing.
- capstone — planning the capstone projectThe plan as a deliverable: the picture, the instrument and chemistry chosen against it, the materials, the budget, the schedule and the hazard assessment.
- capstone — capstone the instrumentThe pinhole calculation, mandatory for every capstone: optimum diameter, effective f-number, the two blurs and where they cross, and corner falloff.
- capstone — capstone permanence and the portfolioOne label per work with the eight metadata fields, and the self-assessment against the rubric with a named piece of evidence behind every band claimed.
- capstone — the capstone chemistry reportThirteen sections, every claim classified as one of five kinds, every number traced, every source cited by key and section, and the submission list.
What these sheets do not carry
- There is no run record here, and the omission is deliberate. The negatives page states that the exposure log, the lab notebook and the curve-plotting sheets between them already carry every field a capstone run needs, and a second sheet carrying the same fields would produce two records of one run and no way to say which was right.
- No acceptance limit or pass mark is printed on the rubric sheet. The bands are the student's own claim and the sheet's rule is the page's: a band claimed with no named evidence scores as the band below it, and that is a rule about evidence rather than a threshold about quality.
- The budget block asks for a subtotal and for the words a floor or a total beside it, because the price file cannot price several of the capstone's consumables and names them among its gaps. A capstone budget that prints a total without saying which it is misstates the one number a reader would act on.